The community of Rochester was hard hit during Tropical Storm Irene, which damaged infrastructure and caused devastating flooding impacts.
The community is making strides to become more resilient to future flooding events, and to protect the town’s water resources by developing a Stormwater Master Plan (SWMP). Recognizing that the future Municipal Roads General Permit will address the rural backroad network, the SWMP will target the village area where developed infrastructure and the most condensed impervious surfaces are located.
The SWMP Project was initiated by the town as a result of concerns about several stormwater runoff issues in the village. The WRP helped coordinate a site visit with technical assistance providers and town officials. Partners visited the top 4 action locations identified in the “Town of Rochester Stormwater Infrastructure Mapping Project” report.
The Project area encompasses 32 acres. Within this area the Stormwater Infrastructure Mapping report estimated that there’s the potential to implement on-the-ground projects that would remove 10,167 pounds of sediment and 56.7 pounds of nitrogen from Stormwater runoff into the White River.
Given the town’s stormwater runoff concerns and the potential to reduce significant inputs of both sediment and nitrogen, the site visit attendees agreed that all 4 action locations should be included in the Project.
Project goals
The goal of the SWMP Project was to reduce stormwater runoff in the village of Rochester. To accomplish this goal, the Project conducted an assessment to determine where stormwater runoff is generated and where it can be captured and removed efficiently by on-the-ground projects.
The resulting SWMP includes a prioritized list of projects and strategies to address/mitigate stormwater runoff, and contains recommendations to preserve natural features and functions, as well as encourage use of low impact green stormwater infrastructure.
Strategic importance
The SWMP Project was identified as a high-priority in the 2013 White River Tactical Basin Plan (Plan), which allowed the WRP to work with the town of Rochester to apply for VT Ecosystem Restoration Program funding to implement the Project in 2018.
As a next step the WRP will work with Project partners to identify funding to implement the top 3 priority on-the-ground stormwater mitigation projects.
The WRP honored 2 Outstanding Watershed Partners at our Annual Meeting on Saturday, October 27 at the Arnold Block in Bethel.
“This year’s Annual Meeting gave folks a chance to catch up with their watershed neighbors, enjoy appetizers provided by 5 Olde Tavern, and celebrate our collective work to improve the long-term health of the White River watershed,” says WRP Executive Director Mary Russ.
As part of the celebration, the WRP honored Rich Kirn and Madeleine Lyttle as the first co-recipients of the WRP’s Outstanding Watershed Partner award. The new award recognizes individuals who make outstanding contributions to the WRP and the White River watershed.
Award co-recipients Rich Kirn and Madeleine Lyttle are fisheries biologists, who retired in 2018 from the Vermont Fish and Wildlife Department and US Fish & Wildlife Service respectively. Both Rich and Madeleine worked regionally – gathering data, developing on-the-ground projects, and advocating for improved habitat and aquatic organism passage throughout Vermont.
However the award recognizes their work in the White River watershed specifically. One example of their outstanding partnership efforts relates to a WRP flood recovery project following Tropical Storm Irene.
After the flood Rich and Madeleine provided technical assistance and funding to a Rochester-based project that replaced 6 flood-damaged, stream-crossing culverts with larger, fish-friendly, flood-resilient structures between 2012 and 2015. Extending their initial investment, Rich and Madeleine’s support enabled the project team to replace an additional 4 under-sized, stream-crossing culverts between 2016 and 2018. In sum the project has opened 20 miles of trout stream to fish passage and reduced the likelihood of significant flood damage along 10 miles of town-maintained roads in Rochester and Hancock.
“Both Rich and Madeleine personify our concept of an outstanding partner,” says Russ. “Their commitment to and investment in our mission have improved the long-term health of the White River watershed while increasing our effectiveness as an organization.”
The WRP presented Rich and Madeleine with a framed water color by Randolph resident and artist Paul Calter. The water color featured Stony Brook, an important cold-water, trout-spawning tributary to the White River in Stockbridge.
The WRP is working with partners to complete a design to remove the Upper & Lower Eaton Dams on the First Branch of the White River in Royalton.
Upper Eaton Dam
The Upper Eaton Dam is located immediately upstream of Royalton’s Mill Road bridge.
Originally built from logs, the dam was rebuilt in 1924 using concrete. The dam was damaged in the 1927 flood, and was not rebuilt.
This dam provided power for the “factory” building that was built in 1882. Before it burned in 1968, the factory was used to make finished lumber, shoes, and small wood parts like drum hoops, hockey sticks, step stools, and clothes pins.
Lower Eaton Dam
The Lower Eaton Dam is located downstream of the Mill Road bridge and immediately upstream of the Mill Village complex.
Originally built from logs in 1776, this dam was rebuilt in the 1920s using concrete. The dam was damaged in the 1927 flood, and was rebuilt in 1943.
This dam provided power for the Mill Village businesses, including a grist mill, saw mill, carding machines and fulling mill, and blacksmith shop. Manufacturing at the Mill Village declined after the railroad was built and South Royalton village became the commerce center in town around the 1870s. The saw mill was in operation until 1970.
Why remove dams?
There are over 1,000 dams located on Vermont’s rivers and streams that serve no useful purpose: originally built to provide a source of power for manufacturing and other private and public uses, these “deadbeat” dams have been abandoned and most have fallen into disrepair.
However many of these dams still span the river channels they were built to harness. So they are blocking the movement of water, sediment, and aquatic life.
Removing these dams restores connectivity to a river system:
Clean water: Sediments trapped behind a dam can contain high levels of pollutants. Removing a dam allows sediments to move through the system, improving water quality.
Fish movement: Vermont’s native fish need to move upstream to find food, to lay their eggs, and to seek cold water during the hot summer months. Removing a dam allows fish and other aquatic life to move freely between upstream and downstream habitats.
Fewer flood damages: Dams elevate water levels and may cause localized flooding during rain events. Removing a dam returns water levels to normal elevations and may reduce damages associated with localized flooding.
The Upper & Lower Eaton Dams are “deadbeat” dams – they no longer serve a useful purpose, and are in disrepair. Both dams prevent fish from migrating upstream and sediment/debris from moving downstream. Removing the dams would improve water quality and restore fish passage to over 30 miles of the White River.
Dam removals in the White River watershed
The WRP is working with our partners to remove deadbeat dams along the White River:
The Randolph Dam on the Third Branch of the White River – removed in 2016
Posted: November 15, 2018 by wrp_admin
Rochester Stormwater Master Plan complete
The WRP has worked with the town of Rochester, VT Department of Environmental Conservation, and Watershed Consulting Associates to develop a Stormwater Master Plan for the village of Rochester.
Project background
The community of Rochester was hard hit during Tropical Storm Irene, which damaged infrastructure and caused devastating flooding impacts.
The community is making strides to become more resilient to future flooding events, and to protect the town’s water resources by developing a Stormwater Master Plan (SWMP). Recognizing that the future Municipal Roads General Permit will address the rural backroad network, the SWMP will target the village area where developed infrastructure and the most condensed impervious surfaces are located.
The SWMP Project was initiated by the town as a result of concerns about several stormwater runoff issues in the village. The WRP helped coordinate a site visit with technical assistance providers and town officials. Partners visited the top 4 action locations identified in the “Town of Rochester Stormwater Infrastructure Mapping Project” report.
The Project area encompasses 32 acres. Within this area the Stormwater Infrastructure Mapping report estimated that there’s the potential to implement on-the-ground projects that would remove 10,167 pounds of sediment and 56.7 pounds of nitrogen from Stormwater runoff into the White River.
Given the town’s stormwater runoff concerns and the potential to reduce significant inputs of both sediment and nitrogen, the site visit attendees agreed that all 4 action locations should be included in the Project.
Project goals
The goal of the SWMP Project was to reduce stormwater runoff in the village of Rochester. To accomplish this goal, the Project conducted an assessment to determine where stormwater runoff is generated and where it can be captured and removed efficiently by on-the-ground projects.
The resulting SWMP includes a prioritized list of projects and strategies to address/mitigate stormwater runoff, and contains recommendations to preserve natural features and functions, as well as encourage use of low impact green stormwater infrastructure.
Strategic importance
The SWMP Project was identified as a high-priority in the 2013 White River Tactical Basin Plan (Plan), which allowed the WRP to work with the town of Rochester to apply for VT Ecosystem Restoration Program funding to implement the Project in 2018.
As a next step the WRP will work with Project partners to identify funding to implement the top 3 priority on-the-ground stormwater mitigation projects.
Posted: November 7, 2018 by wrp_admin
WRP honors Outstanding Watershed Partners
The WRP honored 2 Outstanding Watershed Partners at our Annual Meeting on Saturday, October 27 at the Arnold Block in Bethel.
“This year’s Annual Meeting gave folks a chance to catch up with their watershed neighbors, enjoy appetizers provided by 5 Olde Tavern, and celebrate our collective work to improve the long-term health of the White River watershed,” says WRP Executive Director Mary Russ.
As part of the celebration, the WRP honored Rich Kirn and Madeleine Lyttle as the first co-recipients of the WRP’s Outstanding Watershed Partner award. The new award recognizes individuals who make outstanding contributions to the WRP and the White River watershed.
Award co-recipients Rich Kirn and Madeleine Lyttle are fisheries biologists, who retired in 2018 from the Vermont Fish and Wildlife Department and US Fish & Wildlife Service respectively. Both Rich and Madeleine worked regionally – gathering data, developing on-the-ground projects, and advocating for improved habitat and aquatic organism passage throughout Vermont.
However the award recognizes their work in the White River watershed specifically. One example of their outstanding partnership efforts relates to a WRP flood recovery project following Tropical Storm Irene.
After the flood Rich and Madeleine provided technical assistance and funding to a Rochester-based project that replaced 6 flood-damaged, stream-crossing culverts with larger, fish-friendly, flood-resilient structures between 2012 and 2015. Extending their initial investment, Rich and Madeleine’s support enabled the project team to replace an additional 4 under-sized, stream-crossing culverts between 2016 and 2018. In sum the project has opened 20 miles of trout stream to fish passage and reduced the likelihood of significant flood damage along 10 miles of town-maintained roads in Rochester and Hancock.
“Both Rich and Madeleine personify our concept of an outstanding partner,” says Russ. “Their commitment to and investment in our mission have improved the long-term health of the White River watershed while increasing our effectiveness as an organization.”
The WRP presented Rich and Madeleine with a framed water color by Randolph resident and artist Paul Calter. The water color featured Stony Brook, an important cold-water, trout-spawning tributary to the White River in Stockbridge.
Posted: October 15, 2018 by wrp_admin
Eaton Dams removal design project
The WRP is working with partners to complete a design to remove the Upper & Lower Eaton Dams on the First Branch of the White River in Royalton.
Upper Eaton Dam
The Upper Eaton Dam is located immediately upstream of Royalton’s Mill Road bridge.
Originally built from logs, the dam was rebuilt in 1924 using concrete. The dam was damaged in the 1927 flood, and was not rebuilt.
This dam provided power for the “factory” building that was built in 1882. Before it burned in 1968, the factory was used to make finished lumber, shoes, and small wood parts like drum hoops, hockey sticks, step stools, and clothes pins.
Lower Eaton Dam
The Lower Eaton Dam is located downstream of the Mill Road bridge and immediately upstream of the Mill Village complex.
Originally built from logs in 1776, this dam was rebuilt in the 1920s using concrete. The dam was damaged in the 1927 flood, and was rebuilt in 1943.
This dam provided power for the Mill Village businesses, including a grist mill, saw mill, carding machines and fulling mill, and blacksmith shop. Manufacturing at the Mill Village declined after the railroad was built and South Royalton village became the commerce center in town around the 1870s. The saw mill was in operation until 1970.
Why remove dams?
There are over 1,000 dams located on Vermont’s rivers and streams that serve no useful purpose: originally built to provide a source of power for manufacturing and other private and public uses, these “deadbeat” dams have been abandoned and most have fallen into disrepair.
However many of these dams still span the river channels they were built to harness. So they are blocking the movement of water, sediment, and aquatic life.
Removing these dams restores connectivity to a river system:
The Upper & Lower Eaton Dams are “deadbeat” dams – they no longer serve a useful purpose, and are in disrepair. Both dams prevent fish from migrating upstream and sediment/debris from moving downstream. Removing the dams would improve water quality and restore fish passage to over 30 miles of the White River.
Dam removals in the White River watershed
The WRP is working with our partners to remove deadbeat dams along the White River:
In sum these 5 projects will restore 275 miles of the White River to free-flowing conditions!
Eaton Dam removal design partners
The Upper & Lower Eaton Dam removal design project is in progress – a 30% design is complete and a 100% design will be completed by the end of 2018.
Project partners include 2 landowners, Randolph-based engineering firm Ripple Natural Resources, Vermont Department of Environmental Conservation, Vermont Ecosystem Restoration Program, Upper Connecticut River Mitigation and Enhancement Fund, and US Fish & Wildlife Service.
For more information, visit our Fish Passage Project page.